Chapter 4 Procedures Before Operation - Mitsubishi Electric MELSEC iQ-R Series User Manual

Cc-link ie tsn
Hide thumbs Also See for MELSEC iQ-R Series:
Table of Contents

Advertisement

4
PROCEDURES BEFORE OPERATION
This chapter describes the procedures before operation.
1.
Network configuration
Configure the system and set the parameters which are required for start-up.
• Wiring ( Page 56 WIRING)
• Parameter Setting ( MELSEC iQ-R CC-Link IE TSN User's Manual (Application))
2.
Network diagnostics
Use CC-Link IE TSN/CC-Link IE Field diagnostics to check that cables are connected properly and that modules are
communicating correctly with the set parameters.
For details, refer to the following.
 MELSEC iQ-R CC-Link IE TSN User's Manual (Application)
3.
Programming
Create a program. For details, refer to the following.
Page 60 COMMUNICATION EXAMPLES
When multiple slave stations and the master station are powered on simultaneously, the startup time of the
slave stations may vary. In such a case, the networks are connected in turn, resulting the time may be longer
to complete data links at all stations.
Power on all slave stations, and then, power on the master station to prevent this case.
4 PROCEDURES BEFORE OPERATION
4
23

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rj71gn11-t2

Table of Contents