Huawei iBAT 2.0-CIM01C2 Quick Manual page 3

Hide thumbs Also See for iBAT 2.0-CIM01C2:
Table of Contents

Advertisement

3. After connecting all power cables to the system, connect the BIM cable to the BIM panel port.
Before connecting the cable to the
BIM panel port, connect all power
cables to the system.
Before disconnecting the BIM cable,
disconnect the cable from the BIM
panel port.
After the product is installed, if the
battery is not charged for more than
30 days, you are advised to remove
the iBAT from the battery cables.
2.3
Installing a CIM
The CIM must be installed 1 meter above the ground to ensure proper wireless communication
between the CIM and the BIM.
1. Connect the antenna
delivered with the CIM to the
RF_Z port on the CIM.
2. Strip the adhesive tape from
the CIM fastener, and attach
the fastener to the bounding
frame on the CIM fixed mount.
Then press the fastener for
more than 10 seconds.
Ensure that the
attaching area is clean.
Ensure that the fastener
is firmly attached with
even strength.
3. Clamp the CIM to the fastener.
3

Advertisement

Table of Contents
loading

Table of Contents