Unpacking the Cooling Unit
To prevent damage to the cooling unit, do not remove it from the shipping box until you
are ready to install it.
Check to make sure that the following supplied parts are included:
• Power cord
• 2 small black screws
• 4 strips of foam insulation tape
• 8 mounting screws
Testing the Cooling Unit
Before installing the cooling unit, it should be tested to
make sure that no shipping damage has occurred.
Step 1:
Remove the cooling unit from the shipping
carton and place it in on sturdy, level work
surface. It is recommended that a piece of
cardboard be placed underneath the cooling
unit to prevent damage to the finish.
Step 2:
Locate the by-pass plug and insert it in the
thermostat socket on the front of the unit.
Step 3:
Remove the power cord receptacle cover.
Plug the cooling unit into a grounded 110 VAC
socket on a dedicated 30-amp circuit.
Step 4:
Set the switch to ON. The system may require
10 to 15 minutes to start cooling.
Step 5:
Once operation has been tested, set the
power switch to OFF and unplug the unit,
then remove the by-pass plug.
CONDENSATE
EVAPORATOR
ON
AUTO
POWER
ON
OFF
21

Advertisement

Table of Contents
loading

This manual is also suitable for:

Monogram zwvt1000sr

Table of Contents