1
22
Receiving, unpacking and checking
Receiving, unpacking and checking
Procedure
1.
Remove the transport casing.
2.
Visually inspect the terminal.
3.
Check that all items are included in accordance with the delivery
documents.
The user is requested to check that all software functions are included ac-
cording to the delivery documents after the terminal has been energised.
4.
Check for transport damages.
In case of transport damage appropriate action must be taken against the
latest carrier and the nearest ABB office or representative should be in-
formed. ABB should be notified immediately if there are any discrepan-
cies in relation to the delivery documents.
Store the terminal in the original transport casing in a dry and dust free
place, if the terminal is not to be installed or commissioned immediately.
Observe the environmental requirements stated in the technical data.
Chapter 4
Unpacking and checking the
terminal