Testing The Dead Bus Live Line (Dbll) - ABB REB 551-C3*2.5 Installation And Commissioning Manual

Breaker protection and control terminal
Table of Contents

Advertisement

12.3.3
Synchrocheck and energizing check (SYN)
Parameter
USelection
AutoEnerg
ManEnerg
ManDBDL
UHigh
ULow
FreqDiff
PhaseDiff
UDiff
tAutoEnerg
tManEnerg
OperationSynch
ShortPulse
FreqDiffSynch
tPulse
tBreaker
VTConnection
tSync
FreqDiffBlock
1.
Apply a single-phase voltage 100% U1b to the U-bus (U5), and a sin-
gle-phase voltage 30% U1b to the U-line (UL1).
2.
Check that the SYN1-AUTOOK and SYN1-MANOK outputs are acti-
vated.
3.
Increase the U-Line (UL1) to 60% U1b and U-Bus(U5) to be equal to
100% U1b. The outputs should NOT be activated.
The test can be repeated with different values on the U-Bus and the
U-Line.

Testing the dead bus live line (DBLL)

The test should verify that the energizing function operates for a low voltage on the U-bus and
for a high one on the U-line. This corresponds to an energizing of a dead bus from a live line.
1.
Change the HMI settings AutoEnerg and ManEnerg to DBLL.
2.
Apply a single-phase voltage of 30% U1b to the U-bus (U5) and a sin-
gle-phase voltage of 100% U1b to the U-line (UL1).
Setting
SingleBus
DLLB
DLLB
Off
80% U1b
40% U1b
0,05 Hz
45 °
15% U1b
0.5 s
0.5 s
Off
Off
0.4 Hz
0.2 s
0.2 s
Line
Os
Off
Chapter 13
Verifying settings by secondary
Single bay
Single bay
Multiple
with phas-
bays
ing
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
injection
115

Advertisement

Table of Contents
loading

Table of Contents