First Service After Installation Or Repair - Siemens SIMOTICS HV M Operating Instructions Manual

Electric motor
Table of Contents

Advertisement

Immediately perform an inspection after such faults.
9.1.3

First service after installation or repair

● Check after approx. 500 operating hours, but after not more than one year:
● Further checks may be required if so specified in operating instructions of components
● If you find any deviations during the inspection, you must rectify them immediately. They
SIMOTICS HV M 1RN76308PR900CG0-Z
Operating Instructions 07/2018
Check
The electrical parameters are maintained.
The permissible bearing temperatures are not exceeded.
The smooth running characteristics and machine running noise have not
deteriorated.
The foundation has no cracks or indentations. (*)
(*) You can perform these checks while the motor is at standstill or, if required, while running.
(Page 129) or in accordance with the plant-specific conditions.
may otherwise damage the motor.
Maintenance
9.1 Inspection and maintenance
When the
At stand‐
motor is
still
running
X
X
X
X
X
89

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents