UPS5000-(200 kVA-800 kVA) Top Air-flow Cabinet
User Manual
3.3.2 Securing the Top Air-flow Cabinets Used for a
Multi-Cabinet UPS
Prerequisites
Figure 3-9 Dimensions of the channel steel for the top air-flow cabinet (unit: mm)
(1) Installation hole for the channel steel for
the UPS cabinet
Issue Draft A (2016-12-09)
A dual-cabinet UPS can be installed against a wall, but a four-cabinet UPS cannot be
installed against a wall.
If the UPS is to be installed against a wall, combine the top air-flow cabinets with the UPS
and then move them to the installation position. If the antiseismic kit is configured, secure
it to the UPS first.
If the UPS is to be installed on channel steel, the channel steel for installing the top
air-flow cabinets should be prepared. You need to add only one piece of channel steel for
the top air-flow cabinets apart from the channel steel for the UPS cabinets. The top
air-flow cabinets do not need to be secured to the channel steel. Take a 400 kVA UPS
cabinet as an example. The distance between the top air-flow cabinet channel steel and the
UPS cabinet channel steel is shown in
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Figure
3-9.
(2) Anchor bolt of the top air-flow cabinet
3 Product Installation
18