Mains power cables
DANGER – Serious damage to health / risk to life
— The incoming mains supply cable must be isolated or
disconnected at the supply end of the cable before
making power connections at the transmitter and / or
sensor.
– Before making power connections between the
transmitter and sensor, set the sensor power switch
on the transmitter PCB to the OFF position – see
page 16. This internal switch on the transmitter is
NOT a safety isolation switch and is fitted for
operational purposes only.
Referring to Fig. 15:
1. Prepare the incoming power cable and transmitter to sensor
power cable for connection by cutting back the outer PVC
sheathing and wire ends to the dimensions shown below:
5 mm
(0.25 in.)
50 mm
(2.0 in.)
Incoming power cable
Fig. 15 Incoming mains power cable and transmitter to sensor
power cable preparation
Signal cable
Referring to Fig. 16:
1. Prepare both ends of the signal cable by cutting back the
outer PVC sheathing and wire ends to the dimensions shown
below:
5 mm (0.25 in.)
25 mm (1.0 in.)
Fig. 16 Signal cable preparation – transmitter to sensor
CI/AZ40-EN Rev. A
5 mm (0.25 in.)
50 mm (2.0 in.)
Transmitter to sensor power cable
Signal cable
Mains power and signal cable connections
Mains power connections
Referring to Fig. 17, page 14:
1. Unlock and open transmitter door
unscrew 4 x PCB cover screws
C
.
2. Check sensor power switch
3. Remove cable gland (if used) at entry
transmitter end of incoming mains power cable
correct orientation.
4. Feed incoming mains power cable
E
through entry
and connect to transmitter terminal block
G
. Refit cable gland (if used) at entry
5. Remove cable gland (if used) at entry
I
transmitter end
of mains power cable
orientation.
I
6. Feed transmitter end
and connect to transmitter terminal block
H
gland (if used) at entry
7. Unscrew 4 x sensor cover screws
M
cover
.
8. Remove cable gland (if used) at sensor entry
O
over sensor end
of mains power cable
orientation.
O
9. Feed sensor end
of power cable
and connect to sensor terminal block
N
used) at entry
.
10.Check internal mains connector plug
correct socket for the supplied mains voltage (115 V [upper
socket] or 230 V [lower socket]).
— 115 V (upper socket)
— 230 V (lower socket)
11.Proceed to page 16 to make signal connections.
IMPORTANT (NOTE)
When all connections have been made, set the sensor
D
power switch
to the sensor.
A
using the supplied key,
B
and remove PCB cover
D
is set to OFF (right position).
E
and slide over
F
F
(customer-supplied)
E
.
H
and slide over
J
in the correct
J
of power cable
through entry
K
. Refit cable
C
. Refit PCB cover
.
L
and remove sensor
N
and slide
J
in the correct
J
through entry
P
. Refit cable gland (if
Q
is plugged into the
to the ON position to provide power
in the
H
N