Panasonic LB-DH7 Series Installation Manual page 21

Data archiver
Hide thumbs Also See for LB-DH7 Series:
Table of Contents

Advertisement

Installation of this unit
7
Relocate the connection plate of the topmost
module (3) and place it on the Base Module.
≥ The work is not required if the Base Module is placed
on the top.
≥ The connection plate is secured at the top of the gear rack by
a screw. Remove the screw and remove the connection
plate, and then secure the connection plate to the top of the
Base Module gear rack with the same screw.
≥ Use bit #1 driver with the M2.6 screw.
Torque: 0.5 Nm n10 % (4.5 in-lbs n10 %)
Module to be
placed at the top
Gear rack
Preparatory work for installation
Base Module
It is easier to remove the
connection plate by
removing the screws and
lifting the gear rack.
8
Tighten the screws while pressing the gear
rack for the module to be placed at the top
against the bottom surface. (3 locations k3)
≥ This step is not required if the Base Module is to be
placed at the top.
Left gear rack on
the interface side
 
1 Loosen the screws 2 Push the rack out 3 Tighten the screws
Gear rack on the drawer side
After securing, confirm that
a 2.7 mm (0.11q) gap gauge
cannot be inserted.
21
Right gear rack on
the interface side
 
Interface side

Advertisement

Table of Contents
loading

Table of Contents