ABB COM600 series User Configuration Manual page 26

Substation management units 5.1 sequence control
Hide thumbs Also See for COM600 series:
Table of Contents

Advertisement

26
COM600 series 5.1
Sequence Control Configuration Manual
Figure 4.5-3 Adding sequence end action to sequence PRG
7. Select the added End action from the Devices view. In the corresponding program
editor, define the sequence end action, see Figure 4.5-4.
Figure 4.5-4 Sequence end action definition
1MRS755001
Logic_Editor_Add_End_Action.png
sequence_end.png