ABB AMVAC Installation And Operation Manual page 10

Medium voltage vacuum circuit breakers
Hide thumbs Also See for AMVAC:
Table of Contents

Advertisement

Use of any other racking device not approved by ABB will void the warranty!!
Approved device shown
I
:
NSERTION
(Refer to Figure 1] for compartment detail, [Appendix A] for breaker detail)
1. Open switchgear breaker compartment door [H] to its fully opened position.
2. Align lift truck left & right platform guides with switchgear latch openings.
3. Raise platform for easy insertion of platform guides, then lower lift truck until platform guides are fully engaged and
hooked into switchgear compartment cell.
4. Pull back on lift truck to insure platform is fully engaged & level.
5. Grasp lower truck handles [Appendix A, item 10] on both sides of breaker and pull handles inward to unlatch the
breaker from the lift truck platform.
6. Push breaker into breaker compartment, pulling handles inward before front of breaker truck reaches front of switch-
gear frame or damage to cell interlock tabs [Appendix A, item 11] will occur. Interlocks may prevent or restrict inser-
tion (Refer to Page 11 [Interlocks]).
7. Align cell interlock tabs with breaker compartment slots and push handles out to fully engage tabs into slots (breaker
truck will be flush with switchgear frame).
Inside the breaker there are stored energy capacitors that must be discharged prior to removing the
front cover of the breaker. Wait 10 minutes after breaker removal from the cell prior to removing the
front cover of the breaker for the discharging of the storage capacitors to occur.
R
:
EMOVAL
(Refer to [Figure 1] for compartment detail, [Appendix A] for breaker detail)
1. Confirm (through window) that breaker has been opened and racked to the disconnect position.
2. Open switchgear breaker compartment door to its fully opened position.
3. Align lift truck left and right platform guides with switchgear latch openings.
4. Raise platform for easy insertion of platform guides, then lower lift truck until platform guides are fully engaged and
hooked into switchgear compartment cell.
5. Pull back on lift truck to insure platform is fully engaged and level.
6. Grasp lower truck handles on both sides of breaker and pull handles inward to unlatch the breaker from the switch-
gear frame.
7. Pull breaker from compartment onto lift platform insuring cell interlock tabs are engaged into the platform slots and
breaker truck handles are fully extended.
8. Depending on breaker options, the stored energy capacitor may or may not retain a charge. For AMVAC breakers,
a warning label will be located on the breaker front cover indicating a 10 minute wait time before front cover removal
to allow for the capacitors to discharge.
10
INSERTION AND REMOVAL
CAUTION
DANGER
1VAL050601-MB Rev C

Advertisement

Table of Contents
loading

Table of Contents