Mitsubishi Electric MELSEC iQ-R Series User Manual page 22

Cc-link ie field network remote head module
Hide thumbs Also See for MELSEC iQ-R Series:
Table of Contents

Advertisement

■When the settings of I/O assignment are changed
This section describes the data flow when 0000H is set to the start I/O number of the RX/RY setting of the master station, and
when the I/O assignment setting of the remote head module is changed from the default.
The following shows the assignment when the I/O assignment is set as shown in the following window.
(1)
RX
0000H
003FH
3FFFH
RY
0000H
003FH
3FFFH
(1) RX/RY ranges of the remote head module (station No.1) which are assigned to the master station
• RX: 0000H to 003FH
• RY: 0000H to 003FH
1 FUNCTIONS
20
1.2 Cyclic Transmission
RJ72GF15-T2
RX
X
0000H
003FH
03FFH
RY
Y
0000H
003FH
03FFH
RX10
RY10R2
X
0000H
0000H
000FH
000FH
Y
0000H
0000H
000FH
000FH
RX10
X
X
0000H
000FH
Y
Y
0000H
0000H
000FH
000FH
RY10R2
X
0000H
000FH
Y

Advertisement

Table of Contents
loading

Table of Contents