Setting Up The Unit For Temperature Measurements; The 'Commissioning' Menu [/Welcome/Settings/Commissioning] - ABB PQFS Installation, Operation And Maintenance Instructions

Power quality filter
Table of Contents

Advertisement

If the warning condition is met, the programmable warning will be set and the
associated digital output will be activated when the warning is present for a
preset time. This time has a minimal value of 1 s and can be increased if desired.
In order to increase the time during which the warning has to be present before
the
set./Warnings/Prog. Warnings/Warning delay].
The digital output will be deactivated if the warning has disappeared for a preset
time, which is by default 1 s. In order to change the warning reset delay, go to
[/Welcome/Settings/Customer set./Warnings/Prog. Warnings/Warn. Rst del.]
The warning levels can be changed by the user. In order to do this, go to
[/Welcome/Settings/Customer set./Warnings/Warning levels].

7.7.1.3 Setting up the unit for temperature measurements

For
changing
[/Welcome/Settings/Customer set./Temp unit]
For full redundancy with multi-master filters, these functions need to be set up in each
master unit of the filter system.
The temperature unit can either be °C or °F.
7.7.2

The 'Commissioning' menu [/Welcome/Settings/Commissioning]

WARNING: The commissioning menu is intended to be used by qualified
commissioning engineers that are authorized to change the filter's core installation
settings and to set up the user's requirements.
In multi-master units these functions need to be set up only in the master with the lowest
hardware ID setting.
The complete commissioning procedure must be executed each time a filter is (re)-
installed or when a unit is added to the existing filter.
procedure, the user settings will be lost, so note them down prior to starting the
commissioning procedure.
Refer to
Section 7.4
For an overview of the main items of the commissioning window, refer to
These items are discussed next.
For commissioning the active filter follow the commissioning procedure presented in
Chapter
8.
Remarks:
· The commissioning window incorporates the start, stop and fault
acknowledgement menu (Cf.
digital
output
is
triggered,
the
default
unit
for determining appropriate locking facilities for this menu.
Section
Manual Power Quality Filter PQFS ç The PQF-Manager user interface 91
go
to
[/Welcome/Settings/Customer
for
the
temperature
During the commissioning
7.5)
measurements,
go
to
Figure
61.