Commissioning Instructions; What This Chapter Contains - ABB PQFS Installation, Operation And Maintenance Instructions

Power quality filter
Table of Contents

Advertisement

8

Commissioning instructions

8.1

What this chapter contains

This chapter presents the steps to follow to commission the active filter. The
commissioning of your PQF should be conducted in strict accordance with this procedure.
Before applying the commissioning procedure, make sure that you are familiar with:
-
-
-
-
-
The commissioning procedure consists of 9 steps that should be strictly followed.
Steps
Step 1
Step 2
Step 3
Step 4
Step 5
Step 6
Step 7
Step 8
Step 9
Section 8.11
the filter.
The filter hardware (discussed in
The mechanical installation requirements (discussed in
The electrical installation requirements (discussed in
The PQF programming interface PQF-Manager (discussed in
If the Modbus option has been installed, please refer to the document
"2GCS212012A0050-RS-485 Installation and Start-up guide" for more information
on this item.
Table 49: Steps to follow to commission the active filter
Actions
Visual and installation check
Setting the address of each unit in a multi-unit filter and terminate
the CAN bus
Voltage rating and phase rotation check
Basic commissioning parameters setup
Automatic and manual CT detection procedure
Before starting the filter
Start the filter
Generate filter load
Set up the user requirements
presents the commissioning report to be filled in when commissioning
Chapter
4);
Manual Power Quality Filter PQFS ç Commissioning instructions 109
Chapter
5).
Chapter
6).
Chapter
7).