Figure 9-18 Installing The Ferrite Core On The Ap(A)-R/Ap(R)-R Unit - NEC Univerge SV8100 System Hardware Manual

Hide thumbs Also See for Univerge SV8100:
Table of Contents

Advertisement

Issue 9.0
9 - 18
3.
Install the ferrite core (provided with the unit) about two inches
from the line cord plug.
AP(A)-R Unit
or
AP(R)-R Unit

Figure 9-18 Installing the Ferrite Core on the AP(A)-R/AP(R)-R Unit

4.
Connect the line cord to the unit, limiting the cable length from
the AP(A)/AP(R)-R Unit to the single line telephone to a
maximum of 50 feet.
When only installing the AP(R)-R Unit, plug the AC Adapter (AC-2R/
AC-3R/ ACA-UA Unit) power cord into the indicated AP(R)-R Unit
receptacle and connect it to a power source. Refer to
Connecting the AC Adapter to an Installed Adapter on page
5.
Replace the base plate (or wall mount unit) and attach the line
cord. Refer to
Section 3 Connecting a Multiline Terminal to the
System on page
8-12.
term
Installing D
Series i Optional Equipment
UNIVERGE SV8100
Figure 9-5
9-5.

Advertisement

Table of Contents
loading