Setup - Toro 04384 Operator's Manual

2-wheel-drive traction unit
Hide thumbs Also See for 04384:
Table of Contents

Advertisement

Setup

Loose Parts
Use the chart below to verify that all parts have been shipped.
Procedure
1
2
3
4
5
6
7
8
9
10
11
12
13
Description
Seat
Nut (5/16 inch)
No parts required
No parts required
ROPS assembly
Bolt (5/8 x 4-1/2 inch)
Locknut (5/8 inch)
No parts required
Carrier frame
Spacer
Bolt (1/2 inch x 3-1/4 inch)
Locknut (1/2 inch)
No parts required
No parts required
Offset lift hook (Refer to the Cutting Unit
Operator's Manual for the Installation
Instructions)
Screw (supplied with the cutting unit)
Bolt (#10 x 5/8 inch)
Jam nut (#10)
Cutting unit (sold separately)
Ball stud (supplied with the cutting unit)
Grass Basket
No parts required
Rear weight kit, Part No. 100-6442
(purchase separately)
Calcium chloride (purchase separately)
Rear weight kit, Part No. 99-1645
(purchase separately)
Warning decal 121-2641
CE guard kit, Part No. 04441 (purchase
seperately)
Qty.
1
Mount the seat to the base.
4
Activate and charge the battery.
Install the battery.
1
4
Install the ROPS.
4
Check the tire pressure.
2
2
Mount the front carrier frames.
2
2
Adjust the carrier frame rollers.
Install the oil cooler (optional).
3
6
1
Install the cutting units.
1
3
6
3
Adjust the transport height.
1
18 kg (40
Add rear ballast.
lb)
1
1
Install the EU decal, if required.
Install the EU guard kit.
13
Use

Advertisement

Table of Contents
loading

This manual is also suitable for:

Greensmaster 3250-d

Table of Contents