Initial operation and operating
Other ways to switch ON the system
– Using the web interface of the management blade
Using the web interface of the management blade, you can switch on the
blade server system as well as each of the server blades.
– After power failure
The system automatically switches ON following a power failure, and the
server blades which were operating before the power failure are booted
automatically.
Switching the server blades ON/OFF
The system must be powered ON.
The server blade can be switched ON and OFF in the following ways:
– To switch ON the server blade, press the power button of the server blade.
To switch OFF the server blade, press the power button of the server blade
for 4 seconds.
– Specified switch-ON time/switch-OFF time
The server blade is switched ON or OFF at a time specified in the ServerView
program.
– After power failure
The server blade automatically switches ON following a power failure
(depending on the settings in the BIOS).