Yamaha 40 Installation Manual page 174

Tiller handle steering friction
Hide thumbs Also See for 40:
Table of Contents

Advertisement

c
f
g
a
1
2
3
e
d
b
9. Connect:
• Wiring harness coupler 1
• Warning indicator coupler 2
• Variable trolling RPM switch coupler 3
NOTE:
• Route the wiring harness a, warning indica-
tor lead b, neutral switch lead c, and vari-
able trolling RPM switch lead d as shown.
• Fasten the battery cable e, wiring harness,
variable trolling RPM switch lead, warning
indicator lead, and neutral switch lead with a
plastic tie f as shown.
• Fasten the wiring harness, warning indicator
lead, and neutral switch lead with clamp g
as shown.
10. Fasten:
• Plastic tie 1
NOTE:
Fasten the battery cable, wiring harness, warn-
ing indicator lead, and variable trolling RPM
switch lead to the shift cable and throttle cable.
11. Install:
• Fitting plate 1
• Bolts 2
NOTE:
After secure the fitting plate, lift the tiller handle
straight up and check that the cables and wires
are not stretched.
Bolt:
10.0 N • m
(1.02 kgf • m, 7.4 ft • lb)
165
E

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

90F3060F40F(t)5070 ... Show all

Table of Contents