Preparing for installation
1. Unpack items
1. Inspect all shipping cartons for signs of damage. If you see damage,
contact the shipper.
2. Loosen the band around the cartons and open all cartons.
3. Remove all accessory boxes, packing materials, and envelopes from the
cartons.
4. Have at least three people remove the base unit and any expansion
units.
5. Open and remove the bag in which the base unit is enclosed. Repeat this
step for any expansion units you may have ordered.
6. Compare the items received to the packing list. If any items are missing
or damaged, contact the shipper immediately.
7. Each base unit has a key for locking and unlocking the front bezel. Place
the keys in a safe place.
8. Please keep all packing materials and cartons in case you need to
transport or ship the base or expansion unit.
Hitachi AMS 2100/2300 Getting Started Guide
3