Miele KFN 14943 SDE ED Operating And Installation Instructions page 51

Fridge/freezer combination with ice cube maker nofrost system and dynacool
Table of Contents

Advertisement

^ Attach the stainless steel hose to the
solenoid valve at the bottom rear side
of the appliance.
^ Ensure that the hose is correctly fitted
and that it is water-tight.
^ Slowly open the water shut-off valve
and check the whole water system
for leaks.
^ The appliance can now be
connected to the power supply (see
"Electrical connection").
^ Slide the appliance into the desired
position.
When doing so, make sure that the
stainless steel hose does not get kinked
or damaged.
After a maximum of 24 hours, the
first ice cubes will drop out of the ice
cube maker and collect in the
drawer.
Water supply
51

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents