Installation
Instructions
_-I REMOVE FILTERS
Remove the protective shipping film from the edges
of the metal grease filters. Press the filter locks back and
lift the filters out. Set them aside.
[] REMOVE WIRING COVER
FROM THE JUNCTION
BOX
Remove the wiring cover from inside the hood.
Set the cover and its mounting screw aside.
Wiring
cover
Mounting
Screw "-_._
.
_-IREMOVE DUCT KNOCKOUT(S)
If recirculating, non-vented ductless see note below and
skip to Step 7 and proceed.
Using a flat blade screwdriver, remove the appropriate
duct knockout(s) from the top or back of the hood.
3¼" x 10" Rectangular
vertical discharge.
Remove top rectangular
duct knockout only.
3¼" x !0" Rectangular
horizontal discharge. Remove
rear rectangular duct
knockout only.
NOTE: If the hood is to be installed in a recirculating,
non-vented ductless manner, order charcoal filters, kit
number WB02X!!000
for 30" hood models. These kits
can be ordered from your GE supplier. Skip to Step 7C and
proceed.
NOTE:If the hood in installed for recirculation mode, it is
not ENERGY
STAR @certified.
[_ REMOVE WIRING KNOCKOUT
Remove either the top or the back wiring knockout as
needed and install an approved strain relief clamp.
Strain relief
clamp
10