Download Print this page

GE JV936 Owner's Manual And Installation Instructions page 16

Advertisement

Available languages

Available languages

Installation instructions
iNSTALL CEiLiNG BRACKET
The ceiling
bracket
must
be installed
when
the duct
cover is used to span 24" or more
height
above
the
hood.
The bracket
will hold
the decorative
duct cover
in place
at the top.
Note:
The ceiling
bracket
is not required
when
using
only the 12" section
of the duct cover
* Install
the 2 small screws into
the sides of the duct
bracket.
Remove
the screws. Pre-mpping
the holes
will instlre
ease of final installation.
* Match
center
notch
on the bracket
to the centerline
on the wall and flush against
the ceiling.
* Mark
the 2 screw hole locations.
* Drill 1/8"
pilot holes
in marked
bracket
location.
* If pilot holes
do not enter
studs,
enlarge
the holes
to
3/8"
and
install
wall fastener
anchors.
* Secure
the bracket
to the rear wall with wood screws
and washers.
Use wall anchors
if needed.
Note: Bracket has 2 sets of holes. Use larger holes for wall
fasteners or wood screws with washers. Use smaller holes for
wood screws with washers.
Install
CeilingBracket
WhenDuct
Coveris
Usedto Span
24"or More
See Step 9
to Install
Duct Cover
CONNECT
DUCTWORK
* Push
duct over the end
of the transition
undl
it
reaches
the stop robs°
* Install
ductwork,
maldng
connections
in direction
of
airflow
as illustrated.
* Secure
joints
in ductwork
with sheetmetal
screws.
* Wrap all duct joints
with duct tape for an airtight
seal.
* Use duct
rope to seal the flange
connection.
HouseDuctworl<
DuctTape
OverSeam
andScrew
DuctTape
Onlyfor Proper
Operation
of Damper
_/
J
DuctTapeJ
OverFlange
Air Flow
Screw
Ductworl<
Duct
Stops
siti0n
ACAUTION"
[] Do not use sheet
metal
screws at the transition
to ducta, vork connecfiono
Doing
so will prevent
proper
damper
operations.
Seal connection
with rope only.
16

Advertisement

loading

This manual is also suitable for:

Jv966