Download Print this page

GE JV936 Owner's Manual And Installation Instructions page 13

Advertisement

Available languages

Available languages

Installation instructions
DETERMINE
HOOD, DUCTWORK
AND WiRiNG
LOCATIONS
* Keep
the wood
support
piece
and its screws for
later installation.
Do not discard.
*Measure
desired distance
flom the bottom
of the
hood to the cooking surfitce, 24" rain. to 36" Max.
Refer to the previous page if the accesscn T duct cover
will be used.
*Use a level to draw a horizontal
line indicating
the
bottom
of the hood.
*Use a level to draw the cooktop
centerline
location.
*Measure
15-3/8" up flom the horizontal
line for the
bottom
of the hood. Draw another
horizontal
line.
*Measure
18" up flom the line for the bottom
of the
hood, draw another
horizontal
line to indicate
the
top of the hood.
FOR VERTICAL (Straight Up) DUCTING:
* If venting out the ceiling, extend the centerline
fbrward
on the ceiling.
- Measure 6-7/8" flom drywall to mark centerline
for a
7-1/2" dia. duct hole on the ceiling.
- If drywall is not present,
add drywall thickness
to the
6-7/8" dimension.
,/FOR
CEILING
6-7/8"
Wall_(
VENTDUCTING
CenterlineTo
7_.Eiectrica I
7-1/2" Dia. Hole
\
i
\\
,
"\
I
x
,
_,,;i-
f Centerline
FOR WALL VENTDUCT/"_
Top8"
Min.of
HoodAb°ve
Topof Hood
Bottomof Hood
i
Wood
18"
Support
u
i
=
=
i
=
Electrical
15-3/8"
Venting through a soffit or upper cabinet.
* Follow the same procedure
ff_r ceiling ducting to cut
the 7-1/2" dia. hole through
the top of the cabinet or
soffit.
* See Step 4, page 15 for derails to cut opening
for
duct transition.
FOR DUCTING
THROUGH
REAR WALL:
* Measure
the supplied
duct transition
with any straight
run length of duct used, plus 90° elbow height. Draw a
horizontal
line on the wall intersecting
the centerline.
House Wiring
Location:
* Thej unction
box is fastened
to the back of the hood
on the right
side. See illustrations
for hood
knockout
locations.
Note:
Thej
unction
box can be relocated
to the inside
top of the hood.
House
wiring
may enter
the j unction
box flom
the rear
or the top of the hood
at the right
side.
To route
house
wiring
through
the ceiling
or soffit:
-Cut
a hole approximately
1" dia., 5-7/8"
forward
on
the ceiling,
11-1/8"
to the right
of the centerline
for
30" models
or 14-1/8"
to the right
of the centerline
for 36" models.
To route
house
wiring
through
the wall:
- Cut a hole approximately
1" dia., 10-1 / 16" down
flom
the top of the hood,
11-1/8"
to the right
of the
centerline
for 30" models
or l 4-1/8"
to the right
of the centerline
for 36" models.
* Remove
top or rear
knockout
depending
on your
installation.
. Install
strain
relief onto
back
or top of hood.
Knockout
Locations
14-1/8"for 36" Models
11-1/8"for 30" Models
14-1/8"for 36" models
11-1/8"for 30" models
13

Advertisement

loading

This manual is also suitable for:

Jv966