Preliminary Hardware Verification; Hardware Checklist - HP D7171A - NetServer - LPr Upgrade Manual

Hp netserver lxr 8000 to lxr 8500 upgrade guide
Hide thumbs Also See for D7171A - NetServer - LPr:
Table of Contents

Advertisement

6 Preliminary Hardware Verification

In this chapter, you will perform some basic checks on your newly upgraded
NetServer before you finish the installation and secure it to the rack. You will:
l
Check the hardware.
l
Power on the NetServer.
l
Resolve common installation problems.
l
Start the HP NetServer Navigator CD-ROM and update the BIOS and
firmware.

Hardware Checklist

Before starting the NetServer, check your hardware.
l
The processor tray should be set up as follows:
One processor module and seven terminators are installed.
Two cache coherency filters are firmly seated on the processor
baseboard.
The jumper settings match the speed of the processors.
l
One or two memory boards are installed.
If you have one memory board, at least one 256-MB DIMM is
installed.
If you have two memory boards, both boards are identically configured
with DIMMs. The same size DIMM is placed in the same number
socket on both boards.
l
All three power supplies are installed and the power cord is plugged in.
You have installed the new power supplies, part number 0950-3663.
When the AC power cord is plugged in, the control panel LCD at the
front of the NetServer glows green and displays:
Self-Test done. Ready to Power On.
63

Advertisement

Table of Contents
loading

Table of Contents