Download Print this page

Cisco 15530-LCMB-0200 - ESCON Multiplexing Line Card Multiplexor Hardware Installation Manual page 6

User guide

Advertisement

Rack-Mounting the Shelf
The Cisco ONS 15530 CHAS-E chassis cannot be installed in a 19-inch rack.
Note
At least three people are required to mount the chassis in the equipment rack: two people are needed
Warning
to hold the chassis in place while a third person tightens the mounting screws. When handling the
chassis, always follow proper lifting practices as outlined in the
on page
To flush-mount the Cisco ONS 15530 CHAS-N chassis in a 19-inch equipment rack, follow these steps :
Step 1
Attach the mounting brackets to the shelf (see
Lift the shelf into position between the rack posts (requires two people).
Step 2
Align the mounting bracket holes with the rack post holes (see
Step 3
rack (performed by the third person).
Figure 2-3
Cisco ONS 15530 Hardware Installation Guide
2-6
2-2.
Attaching Mounting Brackets to Shelf
E
A
E
S
A
T
T
S
X
T
T
X
R
T
T
0
X
X
R
X
T
R
T
0
R
X
X
X
X
X
R
R
X
X
T
0
W
X
T
1
T
R
E
X
X
W
X
R
T
1
R
S
X
E
X
X
T
T
R
S
X
X
T
T
T
1
X
R
X
T
T
R
X
R
X
2
X
X
T
R
X
R
2
X
X
X
R
X
T
T
X
2
T
T
R
X
X
3
X
T
X
T
R
T
R
3
X
X
X
X
X
R
T
X
X
T
A
X
3
L
T
T
A
R
A
X
X
4
L
X
T
R
R
R
A
X
X
X
4
M
R
R
R
S
X
M
X
R
S
T
R
X
X
4
T
T
X
R
X
R
X
X
R
5
T
R
X
X
X
X
5
R
X
T
X
T
5
T
R
X
X
X
R
T
R
6
X
X
X
R
6
X
T
X
T
T
R
X
6
X
X
R
T
R
7
X
X
X
R
7
X
T
X
T
T
R
X
7
X
X
T
R
R
X
8
X
X
R
X
8
T
X
T
T
R
X
X
X
8
T
R
R
X
X
X
9
R
X
9
T
X
T
R
X
X
9
R
X
Figure
2-3).
0
T
X
R
0
X
1
T
X
1
R
E
X
A
S
T
T
X
2
R
T
T
X
X
X
R
2
X
R
X
3
W
E
T
T
S
X
X
T
3
R
X
R
X
4
T
X
4
R
X
5
T
X
FAS TEN ERS
5
R
MUS T BE
X
FUL LY ENG
AGE D PRI
OPE RAT ING
OR TO
THE POW
ER SUP PLY
6
FAIL
GOO D
T
X
R
X
6
100 -240 V
8.0- 3.5A
50-6 0HZ
7
T
X
7
R
X
8
9
Chapter 2
Installing the Cisco ONS 15530
"Chassis-Lifting Guidelines" section
Figure
2-4) and attach the shelf to the
OL-7706-01

Advertisement

loading

This manual is also suitable for:

Ons 15530