Vertically Mounting The Ap With Dc Supply To A Wall - Cisco C9124AXE-E Installation Manual

Table of Contents

Advertisement

Vertically Mounting the AP with DC Supply to a Wall

Materials Required
Outdoor rated shielded Ethernet cable
Ground lug (provided with the access point)
Ground block and rod
Crimping tool for ground lug, Panduit CT-720 with CD-720-1 die
#6 AWG ground wire
Procedure
Step 1
Select a mounting location on the pole to mount the AP. You can attach the AP to a pole having a diameter
of 2 to 5 inch (51 to 127 mm).
Step 2
Hold the bracket up against the pole and slide the two band straps through the top and bottom sets of mounting
slots on the mounting bracket.
Step 3
Wrap the band straps around the pole, lock them, and then lightly tighten the clamps using a wrench. Only
tighten them enough to keep the bracket from sliding down the pole
Step 4
Screw an M6 bolt into each of the four bolt holes on the backside of the AP. Do not screw the bolt in all the
way. Leave a gap of about 0.13 inch (3.3 mm).
Step 5
Position the four bolts on the AP into the bracket keyhole slots. Ensure that the AP is seated correctly in the
slots.
Note
Step 6
Using a 10–mm wrench, tighten the four bolts that connect the AP to the bracket to 40 lbf-in (4.5 Nm) of
torque.
Step 7
Locate the AP to its final position. Tighten the band clamps with the wrench so that the AP does not slide on
the pole. Ensure that the clamps are tight enough not to let the AP move.
Step 8
Proceed with installing antennas (only for external antenna models), connecting the data cables, grounding
the AP, powering, and configuring the AP.

Vertically Mounting the AP with DC Supply to a Wall

The AIR-MNT-VERT2= mounting kit contains a mounting bracket for wall mounting or pole mounting, the
AP, and the power supply together.
You can use the mounting bracket as a template to mark the mounting holes' positions for your installation,
install the mounting bracket, and then attach the AP to the bracket.
Caution
The mounting wall, attaching screws, and wall anchors must support a 50-lb (22.7–kg) static weight.
Cisco Catalyst 9124AX Series Outdoor Access Point Hardware Installation Guide
44
The AP should be mounted with the status LED on the base facing downwards.
Installation Overview
Supplied in the
Kit?
No
Yes
No
No
No

Advertisement

Table of Contents
loading

This manual is also suitable for:

Catalyst 9124ax series

Table of Contents