Commissioning Plan

Overview

Commissioning is the process of installing, configuring, and setting up the MAXPRO NVR
system hardware and software. At the end of the commissioning process, the MAXPRO NVR
system is equipped for use by operators to perform video surveillance operations.

Steps in the Commissioning Process

The process of commissioning involves the following phases.

Setting up the MAXPRO NVR

Setting up the MAXPRO NVR involves:
Installing the Software in the Server and Client
Computers
Caution:
MAXPRO NVR 3.1 Commissioning and Installation Guide
Determining the number of MAXPRO NVR server and client computers at the location.
Choosing the desired MAXPRO NVR system architecture.
Connecting the monitors to the MAXPRO NVR. After connecting the monitors, configure
the monitor display properties.
Connecting the keyboards (for example, Ultrakey) to the MAXPRO NVR unit.
Note:
See
Setting up the MAXPRO NVR
NVR system.
For the Honeywell's boxed solutions: MAXPRO NVR XE,SE,PE and
MAXPRO NVR Hybrid XE,SE,PE, the server and client software required is
already installed on the box. Hence the instructions in this section for
server software fresh installation are NOT applicable.
for information on how to setup the MAXPRO