Commissioning; Shutting Down - AEG MTD 350 Operation And Installation Manual

Hydraulically controlled small instantaneous water heater
Hide thumbs Also See for MTD 350:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 23
Installation - for contractors

11. Commissioning

11.1 Initial start-up
» Fill the appliance by running the tap several times
until the pipework and appliance are free of air.
» Carry out a tightness check.
» Insert the power cable plug, if present, into the
standard safety socket or set the fuse/MCB.
» Check the function of the appliance.
11.2 Appliance handover
» Explain the appliance function to users and familiar-
ise them with its operation.
» Make users aware of potential dangers, especially
the risk of scalding.
» Hand over these instructions.
32
11.3 Recommissioning
Material losses
!
Following an interruption of the water supply, recom-
mission the appliance by carrying out the following
steps, in order to prevent irreparable damage to the
bare wire heating system.
» Isolate the appliance from the power supply. Pull the
power cable plug, if present, from the socket, or re-
move the fuse/reset the MCB.
» See chapter "Initial start-up".

12. Shutting down

» Isolate the appliance from the power supply by
means of the fuse/MCB in your fuse box or by pulling
the power cable plug from the socket.
» Drain the appliance (see chapter "Maintenance").

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mtd 440Mtd 570Mtd 650222120222121222122 ... Show all

Table of Contents