Preparations; Installation - AEG MTD 350 Operation And Installation Manual

Hydraulically controlled small instantaneous water heater
Hide thumbs Also See for MTD 350:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 23

9. Preparations

» Flush the water line thoroughly.
Water installation
A safety valve is not required.
Taps
» Use suitable taps (see chapter "Appliance descrip-
tion / Accessories").

10. Installation

10.1 Installation site
Install the appliance in a room free from the risk of frost
and near the draw-off tap.
Ensure that the lateral fixing screws for the cover are
always accessible.
The appliance is only suitable for undersink installation
(water connections at the top).
DANGER Electrocution
Protection rating IP25 is only ensured if the appli-
ance back panel is fitted.
» Always fit the appliance back panel.
Installation - for contractors
10.2 Installation options
Undersink installation, pressure-tested, with
pressure-tested tap
Undersink installation, non-pressurised, with
non-pressurised tap
29

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mtd 440Mtd 570Mtd 650222120222121222122 ... Show all

Table of Contents