Calibration Checks Of Static Channels Ps1 And Ps2; Static Channel Calibration Pressures - GE Sensing Druck ADTS 2 Series Calibration Manual

Air data test set
Hide thumbs Also See for Sensing Druck ADTS 2 Series:
Table of Contents

Advertisement

Druck ADTS 2XX Calibration Manual
2
CALIBRATION
2.1
Calibration Check of Static Channels Ps1 and Ps2
Before starting this procedure carry out a leak test.
Set the unit to Leak/Measure mode, set operating limits to MAX and disable Auto Leak,
refer to the User manual for further details.
Connect the pressure standard to static channels Ps1 and Ps2.
(1)
Make sure that the calibration switch is set to disable.
(2)
Adjust calibration pressure to the first pressure value in Table 2-1.
(3)
Compare the pressure value on the calibration standard to the value displayed and
record the difference.
(4)
Repeat (2) and (3) for pressure No. 2 to 9 in Table 2-1.
(5)
If the recorded difference exceeds the allowable tolerance (*) carry out a calibration
adjustment.
(6)
Adjust calibration standard to atmospheric pressure. Disconnect calibration standard
from the channels Ps1 and Ps2.
(7)
If there is no further calibration or testing required, switch off the unit.
*
The tolerance quoted in this table may need to be adjusted to allow for measurement uncertainties of the calibration
standard in use. The limits stated relate to the published, minimum specification for the equipment entering service.
Acceptance limits may vary at the user's discretion for specific applications.
K0425 Issue No. 2
T
2-1 S
C
ABLE
TATIC
HANNEL
Pressure
Pressure
No.
mbar
1
34.98
2
71.72
3
178.74
4
314.85
5
465.63
6
696.82
7
843.07
8
1013.25
9
1355
C
P
ALIBRATION
RESSURES
Tolerance*
mbar
±0.10
±0.10
±0.10
±0.10
±0.10
±0.10
±0.10
±0.10
±0.10
4

Advertisement

Table of Contents
loading

Table of Contents