Cisco 3745 Router Ground Connection - Cisco 3700 Series Hardware Installation Manual

Cisco systems routers hardware installation guide
Hide thumbs Also See for 3700 Series:
Table of Contents

Advertisement

Installing the Chassis Ground Connection
Figure 3-13
Ring terminal
After the router has been installed and properly grounded, you can connect the power wiring; the WAN,
LAN, and voice cables; and the cables for administrative access as required for your installation. For
cable connection procedures, see the
LAN, and Voice Cables" section on page
section on page

Cisco 3745 Router Ground Connection

To install the ground connection on a Cisco 3745 router, perform the following steps:
Strip one end of the ground wire to the length required for the ground lug or terminal.
Step 1
Crimp the ground wire to the ground lug or ring terminal, using a crimp tool of the appropriate size.
Step 2
Attach the ground lug or ring terminal to the chassis as shown in
Step 3
ground lug, use the two screws with captive locking washers provided. For a ring terminal, use one of
the screws provided. Use a number 2 Phillips screwdriver, and tighten the screws to a torque of
8 to 10 in-lb (0.9 to 1.1 N-m).
Connect the other end of the ground wire to a grounding point at your site.
Step 4
Cisco 3700 Series Routers Hardware Installation Guide
3-10
Chassis Ground Connection Using Ring Terminal on a Cisco 3725 Chassis
2
NM -H DV
BA NK 4
BA NK 3
BA NK 2
BA NK 1
1
BA NK 0
3-22.
For the NEBS ground lug—approximately 0.75 inch (20 mm)
For user-provided ring terminal—as required
V0
SEE MAN
UAL BEF
DS U
ORE INS
TAL LAT ION
EN
56K
SEE MAN
UAL BEF
ORE INS
DS U
TAL LAT ION
56K
SEE MAN
"Power Connections" section on page
3-20, and the
"Connecting to a Console Terminal or Modem"
Chapter 3
Installing the Router
UAL BEF
ORE INS
TAL LAT ION
3-11, the
"Connecting WAN,
Figure 3-14
or
Figure
3-15. For a
OL-2180-08

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents