Chapter 2 Getting Started; Power-Up Action; Basic Operations - HIKVISION DS-2AE4225TI-D User Manual

Hd-tvi speed dome
Hide thumbs Also See for DS-2AE4225TI-D:
Table of Contents

Advertisement

User Manual of HD-TVI Speed Dome

2.1 Power-up Action

After the speed dome is power-on, it will perform a series of self-test actions. It runs the pan
checking firstly, then the tilt checking and the camera checking at last. After the power-up actions,
the system information will be displayed for 2 minutes on the live view screen as shown below.
System Info
SN
ADDRESS
COM Format
PROTOCOL
FIRMWARE
HARDWARE
BUILD DATE
 You have to configure the address and the baudrate for the speed dome the same as those in
the control devices.
 The speed dome is self-adaptive to the PELCO-D, PELCO-P, and PRIVATE-Code protocols.

2.2 Basic Operations

You can operate the speed dome using a control device, including the control keyboard, DVR, DVS,
© Hikvision

Chapter 2 Getting Started

SN
ADDRESS
COM FORMAT
PROTOCOL
FIRMWARE
HARDWARE
BUILD DATE
Figure 2-1 System Information
Table 2-1 Descriptions of the System Information
Description
The serial No. of the speed dome, which is unique.
The default communication address of the speed dome.
The communication settings of the speed dome, including baudrate
(2400 by default), data bit (8 by default) and stop bit (1 by default)
digit).
It is for the communication with other devices.
The version of the firmware.
The version of the hardware.
The date when the program of the software is compiled.
XX-XXXXX-XX
XXXXXXXX
0
2400,8,1
SELF ADAPTIVE
X.XX
X.XX
XX XX XX
4

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ds-2ae7230tiDs-2ae5232t-a3Ds-2ae5225ti-a

Table of Contents