Download Print this page

Honeywell HW-AV-LTE-M Product Installation Document page 6

Clss pathway
Hide thumbs Also See for HW-AV-LTE-M:

Advertisement

Powering ON
01. Power ON the communicator and the panel.
02. Ensure that the panel and the communicator are receiving power.
03. Ensure that the Green LED on the communicator is continuously ON indicating successful connections.
NOTE: Refer to the Troubleshooting section if there is an issue and to resolve it.
For Dual-path Communications
01. Connect the LAN port of the communicator to the customer's network.
02. Observe that the Yellow LED for network connectivity is flashing to indicate a live Ethernet connection.
03. The RJ45 Connector LEDs have the following states:
Yellow LED RJ45 Connector
The LED is Constantly ON
Green LED RJ45 Connector
The LED is Blinking
NOTE: Refer to the Troubleshooting section if there is an issue and to resolve it.
Figure 3: Wiring for Dry Contact Relay Monitoring
Indication
Connected with good signal
Indication
Cable connection and
communication with the router
are good.
Action
None
Action
None
6

Advertisement

loading