Post-Installation Checks; Ktr 2280 Mmdr System Checkout; Inspection; Table 2-5 Inspection/Check Procedure - Honeywell BENDIX/KING KTR 2280 System Installation Manual

Multi-mode digital radio
Table of Contents

Advertisement

n

2.4 POST-INSTALLATION CHECKS

2.4.1 KTR 2280 MMDR SYSTEM CHECKOUT

The post-installation test is used to apply power and functionally checkout the system.
Successful completion of the post-installation test verifies the proper operation of the KTR
2280 MMDR.

TABLE 2-5 INSPECTION/CHECK PROCEDURE

that should be performed after system installation as part of a system checkout. A
post-installation test per paragraph
OPERATION
should be performed. In addition, the procedure should be used as a
periodic maintenance inspection check.
EQUIPMENT
KTR 2280
MMDR
Antennas

2.4.1.1 INSPECTION

Perform the following inspection on the overall system:
(1)
Check that cables do not interfere with aircraft controls or other equipment.
(2)
Check cabling for proper routing and check security of tie-down points. In-
spect and adjust cable runs to ensure that cables are not strained, kinked,
or severely twisted and are not exposed to rough or sharp surfaces.
Rev. 0, Aug/2006
©Honeywell International Inc. Do not print without express permission of Honeywell
2.4.1.2 POST-INSTALLATION CHECKOUT/
INSPECTION/CHECK PROCEDURE
A. Inspect external surface for damage.
B. Check that the unit is securely installed and that retaining
mechanism is securely tightened.
C. Ensure that all connections in the mounting tray are properly
mounted and secure.
A. Inspect external surfaces for damage.
B. Check that antenna is properly mounted and mounting
screws are tight.
C. Ensure that antenna coaxial cable connectors are properly
mated and secure.
TABLE 2-5 INSPECTION/CHECK PROCEDURE
KTR 2280 Preliminary H 08/17/06
is a visual inspection/check procedure
Page 2-29

Advertisement

Table of Contents
loading

Table of Contents