Download Print this page

Honeywell G410 Operating Manual page 9

Advertisement

ASSEMBLY INSTRUCTIONS
First Assemble the M6x12mm bolt (AA) to the
right front panel (21) ,Keep a distance of 5mm。
Then assemble the rigth front panel (21) to the
control panel and side burner table using M5x10
mm bolts (BB)
Assemble the side valve and knob base (22) to
the right front panel using M4x8mm bolts (GG)。
First Align to the side valve and side burner
then assemble it to the side burner table using
M4x8mm bolt (GG) 。
Assemble the knob (23) to the side valve
Assemble the ingition pin to the side burner
table using M4x8mm bolts (GG)
Remove the ignitor cap,insert AA battery(1.5V)
into the ignitor body with the positive "+" end fa-
cing out ,replace ignitor cap.
Assemble the side burner rack(19) to the side
burner table.put the warming rack(16) ,cooking
grills(17),flame tamer (18) into the body.
Assemble the "S" style hood (7) to the Left side
table.
WARNING: IT IS VERY IMPORTANT TO CHECK
AND ENSURE THAT EACH AND EVERY BURNER
IS FULLY ENGAGED WITH THE ADJACENT VALVE
ORIFICE BEFORE COMPLETING STEP 10.
FAILURE TO DO SO MAY RESULT IN FIRE OR
EXPLOSION, POSSIBLY CAUSING SERIOUS
INJURY OR DEATH. REFER TO MAINTENANCE
SECTION INSTRUCTIONS TO PROPERLY CHECK
THE ENGAGEMENT.
9
10
(24)
Correct
Incorrect
Incorrect
11
12
9

Advertisement

loading