Download Print this page

Preparation; Assembly Instructions - Honeywell G410 Operating Manual

Advertisement

PREPARATION

Before beginning assembly of product, make sure all parts are present. Compare parts with package
contents list on previous page and hardware contents above. If any part is missing or damaged, do
not attempt to assemble the product. Contact customer service for replacement parts.
Estimated Assembly Time: 50 minutes with 2 people.
Tools Required for Assembly and Leak Testing (not included): Phillips screwdriver, Spray bottle,
Pliers, Adjustable Wrench
THIS UNIT IS HEAVY. Two people required for safe assembly.
Two people required for safe assembly. Some parts may contain sharp edges. Wear protective
gloves if necessary. Read and follow all safety statements, warnings, assembly instructions and
use and care instructions before attempting to assemble and use.

ASSEMBLY INSTRUCTIONS

Assemble the bottom plate (10) and Cart frame (8) to
left cart assembly (6) ,Right cart assembly (11) using
M6x12mm bolts (AA)。
Assemble the locking caster (12) to the left cart asse-
mbly (6) ,Attach the non-locking caster (14) to the right
cart assembly (11) using wrench (II) 。
Assemble the back panel (9) to the left cart assembly(6)
and right cart assembly (11) using M6x12mm bolts (AA)
CAUTION
1
2
6

Advertisement

loading