Section 4 - Commissioning; Language; Filter Flush - Zenith HydroTap C125 Installation Instructions Manual

Filtered chilled drinking water for commercial kitchens and tea rooms.
Hide thumbs Also See for HydroTap C125:
Table of Contents

Advertisement

Commissioning
• Turn ON the water and check for any leaks.
• Turn the power ON at the GPO
• Familiarise yourself with the operation of the Tap, in preparation for use (See User Guide)
• Follow the Installation instructions below (and review Section C of the User Guide).
• After commissioning, the system may be customised by selecting further options in Section G -
Settings, within the User Guide.
4.1
Select the Language
-
Initial Commissioning screen
4.2

Filter Flush

-
Have a 10L bucket or similar container (not supplied) at the
ready to hold a quantity of water that will be ejected while the
Filter Flush Mode is in operation. Open the filter access door
on the front of the HydroTap and the filter cartridge will be
exposed. Located to the rear RHS of the cartridge is a flush
line, approx 600mm long and the flush line stop cock. Place
the valve end of the flush line into the 10L bucket or container.
NOTE: For any subsequent fi lter changes or any operational procedures, please refer to the HydroTap user
guide, located inside the fi lter housing access door.
801525NZ - Chilled HydroTap Installation Instructions - Aug 2015 - v2.00
Section 4
Turn the stop cock ON
1.
Press [Start] [Stop] buttons to start and stop the filter flush.
2.
Allow at least 10 litres of water to flush through the filter.
3.
Once the filter flush is finished, Turn the stop cock OFF
4.
then press [Stop] to end filter flush mode.
Press [Next] and the View screen will show the Flow
5.
calibration mode.
Language selection screen
OPEN
Stop cock
operation
CLOSED
Page 17 of 20

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hydrotap c175

Table of Contents