Advertisement

Quick Links

Hydrotap G4 Celsius
Filtered, Boiling, Chilled and Chilled Sparkling drinking water
with unfiltered Hot and Cold ambient water, for residential kitchens
Affix Model Number Label
802149NZ - BHA; CHA; CSHA -Installation Instructions - Aug 2015 - V2.00
Installation Instructions
ARC
ARC
Here
802149NZ
®
CUBE
CUBE
Page 1 of 28

Advertisement

Table of Contents
loading

Summary of Contents for Zenith Hydrotap G4 Celsius

  • Page 1 Installation Instructions ® Hydrotap G4 Celsius Filtered, Boiling, Chilled and Chilled Sparkling drinking water with unfiltered Hot and Cold ambient water, for residential kitchens CUBE CUBE Affix Model Number Label Here 802149NZ 802149NZ - BHA; CHA; CSHA -Installation Instructions - Aug 2015 - V2.00...
  • Page 2 Models Model BHA Model CHA Model CSHA Page 2 of 28 802149NZ - BHA; CHA; CSHA -Installation Instructions - Aug 2015 - V2.00...
  • Page 3: Table Of Contents

    Index Specifications Installation check list ........................4 General Product Features ......................5 Important Safety Instructions ....................... 6 Warnings and Regulatory Information ..................7 Major components and Accessories .................... 8 Technical Specification ........................ 9 Before Installation and site requirements ..................9 STEP 1 - Measure and cut all the tap holes before fitting the taps Section 1 - Tap Installation instructions ..................
  • Page 4: Installation Checklist

    Installation checklist Before Installation: Read the instructions and check if there is adequate space to mount all of the components. Note: Not all fittings are supplied with the appliance kit. Isolation valves are not supplied. Check the mains water pressure is between 172-700kPa for BHA & CHA or 250-700kPa for CSHA units Check the water quality to determine if extra filtration will be required.
  • Page 5: General Product Features

    General Product Features Thank you for purchasing a Zenith Celsius. Please read and follow these instructions carefully to ensure safe and trouble free service. If service is required, please call 0800 558055 What is the Zenith Celsius ? The Zenith Celsius is a conventional flick mixer tap that dispenses, Boiling or Chilled still and Chilled Sparkling water from the same outlet.
  • Page 6: Important Safety Instructions

    Lifting Take care when lifting the Zenith Celsius unit. Some units may exceed safe lifting limits. If you feel this is beyond your personal capabilities, please seek assistance with the lift. The weights of the units are marked on the packaging.
  • Page 7: Warnings And Regulatory Information

    Important Safety Instructions WARNINGS The Zenith Celsius unit must be earthed. The resistance of the earth connection from each exposed metal part must be less than 1 ohm. All Installation and service work must be completed by trained and suitably qualified Tradespeople. Faulty operation due to unqualified persons working on this product, or any other Zenith product may void warranty coverage.
  • Page 8: Major Components And Accessories

    Major components and accessories Parts supplied Description Accessories Description 1 off Replacement CO Tap with hoses Gas Cylinder 1 off Replacement Filter Undersink Unit with air and water filters 1 off Mains water connection hose Vent Kit 1 x Inlet vent 1 x Outlet vent 9 x Screws 1 x Tee piece for...
  • Page 9: Technical Specification

    Installation Instructions. Refer to technical specification for dimensions. Refer to section 3 & 4, for Installation instructions. • For Zenith Celsius models, a 220-240Vac, 10A GPO will be required. NOTE: Check all cable and hose lengths against inlet /outlet positions before proceeding (See section 4 for general layout).
  • Page 10: Step 1 - Measure And Cut All The Tap Holes Before Fitting The Taps Section 1 - Tap Installation Instructions

    Section 1 Tap Installation Special Tools Required: In addition to normal tools, the following will be required: • 35mm diameter sheet metal hole punch for sink tops. (Not supplied) • 35mm diameter hole saw for timber bench tops. (Not supplied) •...
  • Page 11: Bench Top Hole Size

    CSHA Tap connections BENCH TOP Ø35mm Cut a 35mm hole in the bench / sink top. Chilled Sparkling Tap components Note: Trim all silicon tubes to minimise any dead leg of water. BLACK RUBBER Seal BRASS WASHER RUBBER Washer BRASS PLUG Y-PIECE CHILLED...
  • Page 12: Bha & Cha Tap Connections

    BHA and CHA Tap connections Boiling model Vent BLACK RUBBER outlet SEAL BRASS WASHER RUBBER Washer PLUG BRASS VENT TUBE BOILING CHILLED TUBE HOT & COLD BRAIDED HOSES Page 12 of 28 802149NZ - BHA; CHA; CSHA -Installation Instructions - Aug 2015 - V2.00...
  • Page 13: Tap Installation

    Tap Installation • Pass all the hoses, tubes and USB lead through the 35mm hole. • Ensure the black rubber seal is correctly positioned to give a water tight seal Boiling model Vent outlet BLACK RUBBER SEAL RUBBER WASHER 35mm HOLE IN BENCH FIT THE RUBBER WASHER,...
  • Page 14: Section 2 - Ventilation

    Section 2 Ventilation When installing air flow ducts, the following tools will be required: • Jigsaw and 12mm drill • Keyhole or Wall Board saw. Ventilation for All Models Proper air circulation must be provided for all Boiling and Chilled models. The system will operate correctly only if the recommended air gaps are achieved during Installation.
  • Page 15: Cutout Details

    Ventilation The following instructions are critical if there is insufficient cupboard air circulation. If the air flow, using the silicon door buffers, is insufficient, it will be necessary to fit a standard vent kit, which ensures heat dissipation through natural convection via installed vents. For high use applications, where the cupboard space temperature is near 35°C, or higher, the inlet vent (See Item B below) and silicon buffers, need to be fitted.
  • Page 16: Cut Out Procedure

    Ventilation Typical Cut out procedure for Mark out and cut the air inlet and door outlet holes as shown Ensure the air inlet vent and air outlet vent are positioned at opposite ends of the same cupboard space. Fit the inlet vent, as shown and secure with 5 screws If required, fit the outlet vent, as shown in the hottest part (top) of the cupboard and secure with 4 screws Air inlet vent...
  • Page 17: Step 3 - Fit The Co2 Gas Cylinder (Csha Model) Section 3 - Co2 Cylinder

    Section 3 CSHA - 1kg CO Cylinder Secure the cylinder mounting Secure the gas bottle supplied to a suitable wall, within 1 metre of the unit, in an upright position. This is done by screwing the metal plate holding the Velcro strap to a cupboard wall, 200mm above the floor or base of the cupboard.
  • Page 18: Connect And Secure The Co2 Gas Cylinder

    CO2 Connections pressure set zone -2.7-3.0 bar After replacing a bottle or after making a gas connection: Stage1: Turn the gas OFF Using soapy water applied with a sponge, or with a brush, cover all of the gas joints with a liberal amount of soap suds.
  • Page 19: Step

    Section 4 Undersink Unit Installation Hose fitting Install the mains water braided hose to the undersink unit before locating the unit in place. Note: The connection hoses supplied with the tap head assembly and cold inlet CANNOT be lengthened. Note: Insulate the Blue and White tubes after trimming to length John Guest fittings (Insertion and removal)
  • Page 20: External Bypass Valve

    The diverter bypass valve allows the user to choose to have the boiling feed water bypass the internal filter and only be filtered by the external filtration. This diverter valve is located at the rear panel of the Zenith HydroTap undersink unit, see the image below.
  • Page 21: Bha Installation

    Installation Instructions Model BHA Note: All silicon tubes must be cut to size. They must have a constant fall back to the unit. MAINS MIXER MIXER BOILING BYPASS VENT BYPASS POWER CORD Note: - Mains hose length is 750mm - Plug and Cord length is 1800mm Position the undersink unit close to the Celsius...
  • Page 22: Cha Installation

    Installation Instructions Model CHA Note: All silicon tubes must be cut to size. They must have a constant fall back to the unit. CHILLED MAINS POWER OUTLET CORD Note: - Mains hose length is 750mm - Plug and Cord length is 1800mm Position the undersink unit close to the Celsius...
  • Page 23: Csha Installation

    Installation Instructions Model CSHA Note: Trim all plastic tubed to mini- mise any dead leg of water CHILLED MAINS SPARKLING POWER OUTLET OUTLET CORD Note: - Mains hose length is 750mm - Plug and Cord length is 1800mm Position the undersink unit close to the Celsius tap and according to the hose and cord lengths...
  • Page 24: Section 5 - Commissioning

    Section 5 Commissioning The Celsius is now ready to be commissioned. • Turn ON the water and check for any leaks. • Turn the power ON at the GPO and at the side of the undersink unit. • Familiarise yourself with the operation of the Tap, in preparation for use (See User Guide). •...
  • Page 25: Boiling Calibration (Bha Model)

    fi lter housing access door. Boiling Calibration (Model BHA) The Zenith HydroTap is equipped with a self-calibrating program to adjust for altitude. On start up, the controls take the system through a calibration process. Once this mode is complet the system reverts back to normal operation.
  • Page 26: Trouble Shooting Table

    Flow Sensor Fault Internal fault Call Zenith Service Call an electrician, a plumber, or Zenith on 0800 558055 for assistance, service, spare parts or enquiries. Page 26 of 28 802149NZ - BHA; CHA; CSHA -Installation Instructions - Aug 2015 - V2.00...
  • Page 27: Notes

    Notes 802149NZ - BHA; CHA; CSHA -Installation Instructions - Aug 2015 - V2.00 Page 27 of 28...
  • Page 28: Contact Details

    WMKA00099 AS 3498 The terms “Zenith” and “Celsius” are registered trade marks of Zip Heaters (Aust) Pty Ltd. Zenith products described in this publication are manufactured under one or more of the following patents: AU675601, AU637412, AU635979, GB0422305, GB2065848, US4354049, US5103859, US5099825 and SA2006/08043.

Table of Contents