Oir - Cisco 7000 Series Hardware Installation And Maintenance

Hide thumbs Also See for 7000 Series:
Table of Contents

Advertisement

CHAPTER
Maintenance
This
field-replaceable
startup
upgrade
procedures
replacing
components
frequently
publication
replacement
The
removal
Redundant
while
RP
the
blower
the chassis interior
Warning
on
the front of the backplane
switches
This chapter
RP
installing replacing
components
Power
Air
Internal chassis
replacing
Warning
Recommendations
maintenance
chapter
provides
FRUs
Your
units
when
leaves
the factory
it
system add components
your
for installing replacing
internal
system components
and microcode
Software
updated
information
Detailed
up-to-date
parts
components
replaceable
system

OIR

and
those
that
require
interface
power
supplies
You
the system
is
operating
SSP
SP
or
of the
or
any
Access
the
to
internal
components
which
exposes
supplies are not shut
If
all
power
becomes
OFF
are turned
before
contains
information
and
SP SSP
interface
processors
upgrading and
and when
necessary
and
installation
supply
and
cleaning
filter
replacement
component
replacement
the system
blower
Before
any
performing
the chapter
in
for the Cisco
procedures
router
is
configured
to
As your communication
requirements
the
or
initial
change
configuration
and
interface
reconfiguring
such
the
system blower
as
component
upgrades
basic replacement
therefore
only
instructions called
configuration
two
into
fall
categories
down
shut
the system
to
you
and
the
air
processors
must
turn off
however
internal
components
the
also
that
requires
the
power
supply
wiring
down
the high current
hazard
therefore
always
the front chassis panels
removing
on
the following
and
installation
configuration
the processor
reconfiguring
instructions for using
replacement
for
instructions
LED
and
the
the
arbiter
board
in
this
procedures
chapter
for Installation
Preparing
7000
and
and
router
its
spare
and
order
for
installation
your
ready
may
change
you
This chapter
describes the
and
for adding
processors
and
board
front panel
arbiter
numbers and
require
specific
part
included
guidelines
are
with
notes
shipped
are
those
online
insertion
that
support
before
power
replacement
OIR
and
can
filter
support
before
all
power
supplies
replacing
LED
board
board
arbiter
or system
you remove
the
front
panels
and backplane
100A
the wiring
present
in
make
sure
that
all
power
and
the chassis
exposing
general
instructions
modules
and
associated
software
commands
configuration
the
chassis panels
front
removing
board
review
the section
Safety
and
want
to
and
other
in this
the
and
be
replaced
the
access
to
and
supply
interior
for
and
Maintenance
5-1

Advertisement

Table of Contents
loading

Table of Contents