General Installation - Cisco 7000 Series Hardware Installation And Maintenance

Hide thumbs Also See for 7000 Series:
Table of Contents

Advertisement

General
Installation
General
Installation
The
router
should
Preparing
When
the chassis
The
Multiple
Dust
cleaning
When
at least
installing/replacing
connection
Warning
edge
Step
Step
Step
Warning
processors
support
Step
Step
Step
Step
7000
3-2
Cisco
Hardware
Installation
be
should
the area
already
in
be determined
if
already
for
Installation
on
the router
table or floor ensure
installing
and have
considered
the following
location
does
not block
the chassis intake
be
chassis
can
placed
accumulates
floors
on
If
minimum
dust
of
Excessive
or
replacement
raised platform
or sturdy table provides
where
deciding
to install
or
of clearance
feet
power
supplies
cables
or
equipment
Two
are required
people
and
hands Keep
with
both
lift
Make
sure
the area
that
make
sure
the location
to
your
path
On
the rear of the chassis
Check
the ejector levers
installed
are securely
Check
the captive
installation
and
processor
tighten
Ensure
both
that
power
Never
the chassis with
to
attempt
lift
or
the
by
panels
plastic
the
weight
of the chassis
Two
people
are required
bottom edge
the
chassis
grasp
back
the
Together
slowly
Place
the router
in
location
front
is
panel
not
drawing
Ensure
you have
that
at least
You
need
will
this
space
LEDs
and
observe
After
you
correctly position
Supplies
and
Maintenance
where you
will
install
Site Requirements
not
the section
refer
to
that
you
and
front
side
do
by
but
not stack
side
the router
are
placing
you
amounts
drawn
of dust
in
by
environment
cleaner
consider
future
any equipment
for
the
supplies
power
installing
or interface
processors
the chassis safely
to
lift
Grasp
back
and
lift
your
straight
which you
will
the router
in
install
unobstructed
is
do
the following
and
SP or
RP
ensure
the
that
RP
on
screws
the
loose
that
any
are
supply bays
are
empty
the handles
on
the front of the chassis
on
With
perform
to
this
step
one hand
of the chassis with
Avoid
sudden
the chassis
lift
where
the
intake vent
air
from
in exhaust
other
air
three or four
of clearance
feet
the
to install
power
supplies
the chassis
the following
proceed
to
and
location
it
installation
your
the chapter
in
have
safe location
planned
clean
back
exhaust
panel
vents
them
on
the floor
find
location
to
try
blower
the
will
require frequent
than
does
the floor
maintenance
requirements
and
maintenance
for
later
network
or
making/adding
the chassis underneath
back
with
not your
your
legs
and
of debris
fre
is
SSP
and
interface
all
processors
SSP
SP or
and
each
interface
the
on
the
power
supplies or
These
handles
are not designed
side of the
positioned
at either
person
and
the front
the other near
near
moves
twists
or
to
prevent
the bottom
the front of the chassis
on
equipment
around
the rear of the chassis
the chassis
perform maintenance
on
section
Installing
for
with
filter
Allow
the lower
Also
dust
interface
to
injury
Power

Advertisement

Table of Contents
loading

Table of Contents