Equipment-Rack Ventilation; Power; Preparing; Network Connections - Cisco 7000 Series Hardware Installation And Maintenance

Hide thumbs Also See for 7000 Series:
Table of Contents

Advertisement

Ventilation
Equipment-Rack
If
you
overtemperature
Racks
Install
an
negative
necessary
The
Equipment
the intake ports of
near
For
Environmental

Power

Follow
Check
you
Install
Connect
second
Preparing Network
When
factors
or thin coaxial
you need
transceivers
the router
own
service representative
and
Additional
Optional
You may
To
EIA/TIA-232
and
Note
synchronous
devices
the router
install
to
plan
conditions
in addition
in the chapter

Preparing

the chassis only
in an
whenever
rack
open
possible
ventilation
that
is
system
pressure around
the chassis
the chassis with
operate
correct
use of
inside
baffles
bottom
near the
of
equipment
rack
the top of the
functional
of the environmental
description
and
Monitoring
when
these
precautions
the
site
power
at
your
clean
are
power
receiving
avoid
to
grounding
proper
redundant
supplies
power
source
for redundant
Connections
network
for
preparing
site
your
related
each
type of interface
to
or twisted-pair
cabling
connect
each
to
interface
modems
channel
service
have
additional
external
all
the cable
refer
cables
to
pinouts
Connection
Equipment
need some
of the following
and
the router
install
configure
DCE
console
cable
the
cable
after
installation
The
and
console
auxiliary
When
connecting
and
the console
to
auxiliary ports
in
an
equipment
rack
follow
the guidelines
to
that
for Installation
enclosed
rack
has adequate
that
too powerful
closed
in
rack
and
the
redirecting
the rack
open
the enclosed
rack
can
rack
excessive
may
generate
above
leading
to
overtemperature
monitor
Functions
Reporting
in
the chapter
connections
planning
power
before
and
installation
periodically
conditioner
Install
power
from
damage
lightning
to
separate
input
power
if
line
power
is
separate
connections
the router
to
such
the type of cabling
as
distance
limitations
and
any
additional
interface
CSUs
or data
units
and
cables
equipment
For
in
Appendix
ordering
communications
data
you need
terminal
DB-25
with
plugs
at
and
configuration
procedures
ports are
serial
asynchronous
modems
devices
such
serial
as
and
synchronous
Preparing
these
for avoiding
precautions
in
the section
are
provided
or an
exhaust
ventilation
may
also
cooling
prevent
from
the chassis intake
air
away
in cooling
the chassis
assist
heat
drawn upward and
that
is
conditions
the chassis
in
and
the
status
refer
levels
Overview
Product
the router
to
after
installation
if
necessary
and power
surges
whenever
lines
possible
not already
place
in
you must
consider
for each
required
type
for each
the
signal
type
specific
you need
equipment
DSUs
service
Before
units
on hand
intend
If
to
you
contact
information
equipment
your installation
to
complete
DTE
EIAJTIA-232
with
an
ends You
both
detach
can
complete
are
and
the
FSIP
serial
ports are
DSUs
or
connect
only
asynchronous
devices
the
FSIP
serial
to
Preparing
Network
Connections
Equipment
fan
use
by
creating
vent
If
into
or
at
the section
to
ensure
that
to
Install
number
of
thick
fiber
cables
such
as
installing
build
your
customer
and
an
port
the terminal
ports
2-17
for
Installation

Advertisement

Table of Contents
loading

Table of Contents