Cisco 7000 Series Hardware Installation And Maintenance page 206

Hide thumbs Also See for 7000 Series:
Table of Contents

Advertisement

Step
Step
Panels
the
Replacing
Follow
Step
Step
Step
Step
Step
Step
Step
Step
Step
This completes
While
against the top of the panel
pushing
slightly
frame outward
the
inches
about
EMI
have
will
shielding
you
outward
However
be
careful
the chassis
or
may
you
damage
When
bottom
frame
the
of the
and
pull the panel
positions
these
replace the front chassis panels
to
steps
the sides of the top panel
Grasp
Two
tabs
the top edges
at
guide
opening
the top of the panel
Tilt
two
the
tabs into the chassis slots
slide
guide
Check
and
the top of the panel
Failure
align the panel
to
at this
next step
Push
the panel
upward
push
to
bottom
toward
of the panel
Maintain
5-23b
Figure
steady
slots
When
the panel
flush against the
is
bottom
of the panel
level with
is
one hand
Place
the
of
palm
place and
the
palm
in
place
frame
See
5-23d
Figure
Use
hand
bottom
the
at
your
the chassis
into
until
opening
of the chassis
front
See
Figure
EMI
the
enough
to
shielding
make
downward
and
that
sure
the chassis
When
the tabs
on
the front sides of the panel
the
two
screws
tighten
captive
To
bottom
replace the
front
holes in the front
of the chassis
lip
See
place
into
Figure
snap
the chassis front panel
and
Removing
constrain
to
See
Because
5-22a
Figure
force
pull the
to
use
to
significant
you do
not
the panel
that
pull
LED
board
the inner bezel or
the chassis
clears
opening
down
and
OFF
See
the chassis
hands
with
both
See
Figure
two
of the panel
into
slots
fit
back
from
about
away
you
See
Figure
make
lined
is
sure
it
with
up
can
in
equipment
point
result
the
the
see
tabs
into
slots
the chassis
frame
the panel
until
upward
to
keep
pressure
of the chassis
front
push
bottom
the
of the chassis
against the top front center of the panel
hand
of your
other
against the
bottom
of the frame
the
to
push
the tabs
the
on
of the panel
front
sides
You
have
5-23d
will
to
into the
opening
the panel
fit
If
the panel
lined
with
the top
is
up
against the sides of the chassis
flush
are
bottom
frame
in the
of the
edge
panel
the
studs
on
place
ball
and push
the panel
onto
5-23e
removal and
procedures
replacement
Chassis Panels
Replacing
the Front
bottom edge
the
it
pivot
of the
compressed
tightly
bottom
of the panel
than
inches
more
from
away
same
hands
the
keep
in
your
5-22b
Figure
5-23a
the top edges
of the chassis
in
30
from
vertical
degrees
5-23a
the top of the chassis
opening
when
damage
performing
and
5-23a
the
Figure
pivot
meets
the chassis
See
the guide
tabs
the chassis
in
the panel
the
until
upward
See
5-23c
opening
Figure
and
brace
hold
to
it
bottom edge
on
the
of the
lip
upward and back
of the panel
are
against the
flush
use
force
to
compress
significant
resists pull
it
slightly
and
of the
opening
sides
back
the
of the panel
the
over
the chassis
the
studs
until
ball
Maintenance
of
and
the
it
in
5-61

Advertisement

Table of Contents
loading

Table of Contents