4MV488000.book 23 ページ 2016年3月2日 水曜日 午後12時36分
Rotor Installation
Pay attention, when tilting the tiller. The gasoline may leak if the tilting
angle is more than necessary.
1. Install the main rotor to the axle.
Insert the retainer (7 x 75 mm) and set the lock pin so that the ring of
the lock pin is in the direction of rotation.
2. Install the extension rotor to the main rotor.
Insert the retainer (7 x 43 mm) and set the lock pin so that the ring of
the lock pin is in the direction of rotation.
RETAINER
(7 x 75 mm)
RETAINER
(7 x 43 mm)
EXTENSION
ROTOR
3. The opposite side rotor is similar.
AXLE
MAIN ROTOR
LOCK PIN
Direction of rotation
OPERATION
23