Mounting And Installation - GE PACSystems ICRXIDIXNE19LCTA User Manual

19" rxi display
Hide thumbs Also See for PACSystems ICRXIDIXNE19LCTA:
Table of Contents

Advertisement

3.3 Mounting and Installation

26
GFK-2898B
For public disclosure
The RXi Display is installed as a panel mounted operator interface. One person can install
the display without the use of any special tools.
Caution
Attention
➢ ➢ To install the display panel
Check the bezel gasket for damage, and replace if necessary.
1.
2.
Swing the eight levers on the back of the RXi Display to their retracted position, held
in place by a ball plunger.
3.
From the front of the enclosure, tilt the RXi Display into the enclosure opening and
rest its two lower brackets on the enclosure opening bottom edge.
4.
Push the top of the RXi Display towards the enclosure until the top latch catches the
enclosure opening top edge.
5.
Swing out the eight levers to rest against the enclosure wall.
Using a #2 Phillips screwdriver, tighten the lever screws to 0.79 Nm (7 in-lb) using
6.
the tightening order illustrated in the following figure.
Mount the RXi Display on a flat surface in a
UL/NEMA Type 1 enclosure.
The cooling fins on the back of the RXi Display must
be vertical. The unit can only be mounted with the
front display connectors oriented down.
PACSystems 19" RXi Display

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pacsystems icrxidixnm19lctaPacsystems icrxidi0nm19lctaPacsystems icrxidi0ne19lctaIcrxidixne19lctaPacsystemsIcrxidixnm19lcta

Table of Contents