Operation Powering The System - RIDGID 120V Operator's Manual

Monitor+ vcr seesnake diagnostic equipment
Table of Contents

Advertisement

Available languages

Available languages

Black and White Monitor
Figure 5 – Completely Closing the Top Door
NOTE! The lower door must be closed before the top door
is closed.
Operation
Powering the System
1. Locate the power cord on the back of the unit. Unhook
the Velcro strap and remove the plug from the holder.
(Figure 6)
NOTE! The outlet inside the cord wrap is not an active
plug. It is the holder for the GFCI plug.
Figure 6 – Power Cord and Cord Wrap
2. Plug the Monitor
+
VCR's power cord into an approved
outlet. Press the reset button on the GFCI. (Figure 7)
NOTE! You must press the reset button every time you
plug the unit in.
+
VCR, Color Monitor
+
VCR
Figure 7 – Ground Fault Circuit Interrupter (GFCI)
3. Unwrap the SeeSnake systems cable from its storage
NOTE! Never twist the connector body or you may dam-
4. Plug the systems cable into the mating connector on
Figure 8 – SeeSnake Systems Cable
Ridge Tool Company
Press Reset
Button
for Power
hooks on the SeeSnake or Mini-SeeSnake frame.
(Figure 8)
age its pins. Twist only the locking sleeve.
the Monitor
+
VCR power supply (connector for
SeeSnake Systems Cable). Orient the systems cable
male connector by locating the "TOP" label and adjust
in UPWARD position (Figure 9). Make sure the guide
pin on the systems cable is properly aligned into the
guide socket on Monitor
pin is on the top of the connector. When joining
these connectors, make sure you push straight in until
fully seated and then screw down the locking sleeve.
Figure 10 shows a close-up of the joining connectors.
Figure 11 shows connector functions.
+
VCR's connector. This guide
SeeSnake
System Cable
7

Advertisement

Table of Contents
loading

Table of Contents