Product Setup; Security - GE D30 Instruction Manual

Line distance protection system
Hide thumbs Also See for D30:
Table of Contents

Advertisement

CHAPTER 5: SETTINGS
A CT/VT module contains up to eight input channels, numbered 1 through 8. The channel numbering corresponds to the
module terminal numbering 1 through 8 and is arranged as follows. Channels 1, 2, 3, and 4 are always provided as a group,
hereafter called a "bank," and all four are either current or voltage, as are channels 5, 6, 7, and 8. Channels 1, 2, 3 and 5, 6,
7 are arranged as phase A, B, and C respectively. Channels 4 and 8 are either another current or voltage.
Banks are ordered sequentially from the block of lower-numbered channels to the block of higher-numbered channels,
and from the CT/VT module with the lowest slot position letter to the module with the highest slot position letter, as follows.
Increasing slot position letter -->
CT/VT module 1
CT/VT module 2
< bank 1 >
< bank 3 >
< bank 2 >
< bank 4 >
The UR platform allows for a maximum of six sets of three-phase voltages and six sets of three-phase currents. The result
of these restrictions leads to the maximum number of CT/VT modules in a chassis to three. The maximum number of
sources is six. A summary of CT/VT module configurations is as follows.
Item
CT/VT Module
CT Bank (3 phase channels, 1 ground channel)
VT Bank (3 phase channels, 1 auxiliary channel)
5.2.2.3 CT/VT input channel configuration
Upon relay startup, configuration settings for every bank of current or voltage input channels in the relay are generated
automatically from the order code. Within each bank, a channel identification label is assigned automatically to each bank
of channels in a given product. The bank naming convention is based on the physical location of the channels, required by
the user to know how to connect the relay to external circuits. Bank identification consists of the letter designation of the
slot in which the CT/VT module is mounted as the first character, followed by numbers indicating the channel, either 1 or 5.
See the HardFiber instruction manual for designations of HardFiber voltage and current banks.
For three-phase channel sets, the number of the lowest numbered channel identifies the set. For example, F1 represents
the three-phase channel set of F1/F2/F3, where F is the slot letter and 1 is the first channel of the three channels.
Upon startup, the CPU configures the settings required to characterize the current and voltage inputs, and it displays them
in the appropriate section in the sequence of the banks (as described earlier) as follows for a maximum configuration: F1,
F5, M1, M5, U1, and U5.

5.3 Product setup

5.3.1 Security

5.3.1.1 Security overview
The following security features are available:
Password security — Basic security present by default
EnerVista security — Role-based access to various EnerVista software screens and configuration elements. The
feature is present by default in the EnerVista software.
CyberSentry security — Advanced security available using a software option. When purchased, the option is
automatically enabled, and the default Password security and EnerVista security are disabled.
Lost password
If all passwords are lost, recovery is possible by resetting the unit to default values. Note that the relay is reset to default
values, not just the passwords.
D30 LINE DISTANCE PROTECTION SYSTEM – INSTRUCTION MANUAL
CT/VT module 3
< bank 5 >
< bank 6 >
Maximum number
1
1
1
PRODUCT SETUP
5
5-7

Advertisement

Table of Contents
loading

Table of Contents