GE C70 Instruction Manual page 57

Capacitor bank protection and control system
Hide thumbs Also See for C70:
Table of Contents

Advertisement

CHAPTER 3: INSTALLATION
PANEL CUTOUTS
The torque used to connect the terminal blocks to the back of the relay chassis (screws a, b, c shown) is 9 inch-pounds. For
the connections to the terminal blocks (rows 1 to 8), use a minimum of 17 inch-pounds. During manufacturing, the power
supply and CPU modules are installed in slots B and D of the chassis with 13 inch-pounds of torque on the screws at the
top and bottom of the modules.
3
C70 CAPACITOR BANK PROTECTION AND CONTROL SYSTEM – INSTRUCTION MANUAL
3-9

Advertisement

Table of Contents
loading

Table of Contents