Source Assignment; Bank Unbalance Calculations - GE C70 Instruction Manual

Capacitor bank protection and control system
Hide thumbs Also See for C70:
Table of Contents

Advertisement

SETTINGS EXAMPLE

8.4.3 Source assignment

The following sources must be assigned for the protection functions indicated:
Source 1 (bus) is assigned with CT and VT banks connected to the bus, providing a signal source for overcurrent, phase
current unbalance, overvoltage, and undervoltage functions
Source 2 (tap 1) and source 3 (tap 2) are assigned with the VT banks and split window CT bank connected to the tap
point of two strings of the bank, providing a signal source for the voltage differential and phase unbalance functions
The CT and VT connections shown in the earlier figure are assigned the following values in EnerVista UR Setup.

8.4.4 Bank unbalance calculations

The following values are used in unbalance calculations.
The impedance of one capacitor can:
The impedance of one capacitor element, with n = 6 capacitor elements per can:
The impedance of the top healthy capacitor string:
The impedance of the bottom capacitor can:
8
The total impedance of the healthy capacitor string:
The maximum rated line-to-neutral system voltage:
8-14
C70 CAPACITOR BANK PROTECTION AND CONTROL SYSTEM – INSTRUCTION MANUAL
CHAPTER 8: APPLICATION OF SETTINGS
Eq. 8-10
Eq. 8-5
Eq. 8-6
Eq. 8-7
Eq. 8-8
Eq. 8-9

Advertisement

Table of Contents
loading

Table of Contents