Positioning Detachable Blower (Power Head Assembly) - RIDGID VAC12000 Owner's Manual

12 u.s. gallon/45 liter wet/dry vac with detachable blower
Table of Contents

Advertisement

Available languages

Available languages

SP6949 VAC12000 ESF-1.qxp_SP6949 5/15/15 12:11 PM Page 6
Positioning Detachable Blower
(Power head Assembly)
1. To remove the detachable blower from
the lid assembly, press down on the
power head latch under the
detachable blower handle and lift the
blower off the lid of the Vac.
To replace the blower back onto the lid
assembly, proceed to the following
instructions.
Power Head
Latch
Power Head
Latch
Drum
Latch
2. On top of the detachable blower
(opposite the handle side of the
blower); there is a molded plastic lead
that is used to assist assembling the
unit. Position the lead into the
indented area above the "Pull Handle".
3. Rotate the detachable blower down
4. Lightly press down on the carry handle
Detachable
Blower
5. Your new Wet/Dry Vac is ready for
Lid Assembly
Press and Pull
6
until the travel of the unit stops.
of the detachable blower until you
hear the slight "snap" of the power
head latch engaging the blower. The
detachable blower is now latched to
the lid assembly.
use. With the Wet/Dry Vac completely
assembled and ready for use, insert
the push button end of the Pro-Hose
into the inlet of the Vac. The hose
should snap into place. To remove the
hose from the Vac, press the release
button in the hose assembly and pull
the hose out of the Vac inlet, as
shown.
Pro-Hose
Molded
Plastic Lead
Indented
Area
Pull
Handle
Release Button

Advertisement

Table of Contents
loading

Table of Contents