Chapter Content - Siemens SINAMICS G130 Operating Instructions Manual

Converter built-in units 75 kw-800 kw
Hide thumbs Also See for SINAMICS G130:
Table of Contents

Advertisement

Commissioning
5.1

Chapter content

This section provides information on the following:
● Initial commissioning of the chassis unit (initialization) with STARTER and AOP30
– Entering the motor data (drive commissioning)
– Entering the most important parameters (basic commissioning), concluding with motor
● Data backup
● Parameter reset to factory settings
Inverter chassis units
Operating Instructions, 07/2016, A5E00331449A
identification
5
125

Advertisement

Table of Contents
loading

Table of Contents